Building Construction mcq | pdf – 02

Building Construction MCQ | Building Material MCQ Building Construction Objective Question Question No. 01 Depth or height of the arch is the (A) Perpendicular distance between intrados and extrados (B) Perpendicular distance between springing line and extrados (C) Vertical distance between springing line and intrados (D) None of the above Answer: Option A        Building material mcq Question …

Building Construction mcq | pdf – 02 Read More »

Civil Engineering MCQ | Civil Engineering Objective Question | PDF – 01

 Civil Engineering MCQ Civil Engineering Objective Question A simple field test carried out to determine deterioration of stones when immersed in water is known as    [Civil Engineering MCQ] (A) Absorption test (B) Moh’s hardness test (C) toughness test (D) Smith’s test Ans – D        [Civil Engineering Objective Question] The machine used to …

Civil Engineering MCQ | Civil Engineering Objective Question | PDF – 01 Read More »

Assumption & Compare between Working Stress Method Limit State Method for design ?

Working Stress Method | Limit State Method What is working stress method? Working Stress Method – In this method, the structure is analysed by the classical elastic theory: the stresses in the members are considered for normal working load condition, and no attention is given to the conditions that axis at the time structural collapse. …

Assumption & Compare between Working Stress Method Limit State Method for design ? Read More »

What is Concrete Compaction | Method | Types | Hand Compaction | Mechanical Compaction | Pressure and Jolting Compaction |

What is Concrete compaction Compaction of concrete – In the concrete the process of mixing of concrete, transporting of concrete and placing of concrete Void (air) is likely to get entrapped in the fresh concrete. Compaction of concrete is a process followed to remove the entrapped air from the concrete. The lower the workability, concrete mixes have …

What is Concrete Compaction | Method | Types | Hand Compaction | Mechanical Compaction | Pressure and Jolting Compaction | Read More »

Surveying Objective Question | Surveying MCQ | Answer | Pdf – 01

 Surveying Objective Question | Surveying MCQ | Answer | Pdf – 01 Question No. 01 To avoid large centering error with very short legs, observations are generally made. (A) To chain pins(B) By using optical system for centering the theodolite(C) To a target fixed on theodolite tripod on which theodolite may be fitted easily(D) All the aboveAnswer: …

Surveying Objective Question | Surveying MCQ | Answer | Pdf – 01 Read More »

Security Deposit | Refund of Security Deposit | PROFORMA

Security Deposit The first part of security deposit including the Earnest money already deposited shall be 5% (five per cent) of the contract value. Security deposit will not carry any interest. The contractor shall deposit immediately after receipt of letter of award of work, the balance of 2%(two per cent) of awarded value, if any, after adjustment of the earnest money already paid …

Security Deposit | Refund of Security Deposit | PROFORMA Read More »

Scroll to Top